Raytheon Technologies contracted Lone Star to construct a simulation of the existing sustainment environment enabling the evaluation of labor cost drivers, material cost drivers and lead time relationships.
The Issue
RTX is responsible for sustaining complex electronics systems, spanning supply chains and engineering across multiple locations.
The legacy approach lacked cost-effectiveness and failed to achieve the desired sustainability outcomes.
The Solution
MaxUp® OPS Stochastic Simulation: Utilized Lone Star’s MaxUp® OPS simulation to analyze the existing sustainment environment.
Holistic Assessment: Evaluated labor cost drivers, material cost drivers, and lead time relationships.
Actionable Insights: Rapid evaluation of multiple strategies, fostering consensus, and preparing for PBL transition.
The Results
Collaborative Efforts: RTX and DOD customers jointly assessed sustainment strategies.
Risk Assessment: Solution used to gauge risk and evaluate proposals deeper in the supply chain.
Optimized Execution: Enhanced sustainment support execution through precise optimization.