Contact us Phone: 972-690-9494
Raytheon Technologies

OPERATIONAL OPTIMIZATION SUCCESS STORIES

Depot Optimization Case Study

Raytheon Technologies contracted Lone Star to construct a simulation of the existing sustainment environment enabling the evaluation of labor cost drivers, material cost drivers and lead time relationships.

The Issue

  • RTX is responsible for sustaining complex electronics systems, spanning supply chains and engineering across multiple locations.
  • The legacy approach lacked cost-effectiveness and failed to achieve the desired sustainability outcomes.

The Solution

  • MaxUp® OPS Stochastic Simulation: Utilized Lone Star’s MaxUp® OPS simulation to analyze the existing sustainment environment.
  • Holistic Assessment: Evaluated labor cost drivers, material cost drivers, and lead time relationships.
  • Actionable Insights: Rapid evaluation of multiple strategies, fostering consensus, and preparing for PBL transition.

The Results

  • Collaborative Efforts: RTX and DOD customers jointly assessed sustainment strategies.
  • Risk Assessment: Solution used to gauge risk and evaluate proposals deeper in the supply chain.
  • Optimized Execution: Enhanced sustainment support execution through precise optimization.

 Learn More about how Lone Star can help you

has been added to the cart. View Cart
Exit mobile version